Sewer replacement will continue west towards Highland Drive and extend east of 1400 East to Yuma Street later this year through 2024. Through October, the Highland Drive/2100 South intersection will be reduced to one lane in all directions with limited left turns while crews replace deep underground utilities and reconstruct the intersection as part of the Highland Drive/1100 East project.Ĭonstruction to replace a 100-year-old sewer line between 1400 East and Highland Drive will also begin with impacts to the 1300 East/2100 South intersection. Much needed Sugar House infrastructure improvements to begin in SeptemberĬonstruction will begin at two intersections on 2100 South in Sugar House at 1300 East and Highland Drive in September. Indigenous Native American Relationships. Salt Lake City Mayor's Office Erin Mendenhall | (801) 535-7704